Project Overview

Located on Montana State University Campus, Hyalite Hall, a six-story co-ed residence hall will house 510 freshmen students in single, double, and triple style rooms.

Battling temperatures as low as -30 degrees and high levels of snowfall, Baker was responsible for the total concrete package to the six-story structure including formwork, rebar, post-tensioning installation, and placement of all concrete.

Despite the challenges and extreme temperatures, the team worked every day without a total weather day shutdown and even achieved 3000psi for PT stressing on 2-3 days by using multiple layers of blankets and indirect heaters to heat rebar and concrete on vertical elements before and after pours.

Client:

Jackson Contractor Group

Location:

Bozeman, MT

Size:

7,000 cy

Completion Date:

July 2019