Distribution | Warehouse

Our quality shines through dramatically within distribution and warehouse projects where floor flatness is a requirement. Baker has been working on these large-scale industrial projects since the early 1970s. Throughout that time, our teams have seen just about everything. With scopes ranging from large foundations and total package, to tilt-up construction and flatwork packages on grade, Baker has been able to achieve the floor flatness numbers required on a project. We ensure the highest levels of quality by utilizing a variety of processes and systems including our pre- and post-pour checks. With this experience under our belts, we can claim with confidence that no requirement is unachievable.

Target Fulfillment Center height=

Target Fulfillment Center

The Target Fulfillment Center is a 1,000,000 sf tilt-up building.  This is Target's 2nd fulfillment center in the United States and houses their online store division. Baker's scope included the total ...
USPS Southern Maine Processing and Distribution Center height=

USPS Southern Maine Processing and Distribution Center

The $58 million parcel sorting hub employs approximately 850 workers. Baker's scope included the fine-grading and place-finish of the light reflective floor slab.
 